Abstract:
Oyster spat recruitment on 10x10 cm tiles submersed monthly at four sites in Barataria Bay. Bay Jimmy and Grand Terre were contaminated, Grand Isle and Hackberry Bay were control sites. Recruitment rates were bimodal in 2012 and similar among sites in 2012, but recruitment only occurred late in the season at control sites in 2013, possibly due to an interaction between low salinity and hydrocarbon exposure. Results indicate possible long term effects on oyster recruitment during low salinity years.
Suggested Citation:
Vozzo, Maria. 2016. Recruitment of oyster spat to collectors at control and oiled sites in Barataria Bay 2011-2013. Distributed by: GRIIDC, Harte Research Institute, Texas A&M University–Corpus Christi. doi:10.7266/N7JH3J43
Data Parameters and Units:
year, month, site, tile surface exposed or protected, tile or plate number, number of spat per 100 cm2, average number of barnacles per 100 cm2 Each row is a separate tile, water quality, site, month, temperature (ºC), salinity ppt, dissolved oxygen %, dissolved oxygen mg/l, site, latitude, longitude, Hackberry Bay 29.27833 -90.01055, Bay Jimmy 29.439716 -89.886116, Grand Isle 29.23656 -90.002033, Grand Terre 29.27833 -89.94333, SCAT Oiling Level, Site Classification, Total PAHs (ng/g), Temperature (ºC), Dissolved Oxygen (DO) (mg/L)
Methods:
supplemental data also collected on salinity and pah concentrations in sediment at each site and year For both 10 x 10 cm settlement tiles and 0.3 x 0.3 m commensal bags, we tried to follow a schedule of deploying as closely to the beginning of the month and collecting at the end of the month. In 2012 sampling was conducted the first week of the month whenever possible. April 24, 2013 - Spring commensal bags deployed May 28, 2013 - Spring commensal bags retrieved July 2, 2013 - Summer commensal bag deployed July 31, 2013 - Summer commensal bags retrieved October 3, 2013 - Summer commensal bags deployed October 29, 2013 - Summer commensal bags retrieved May 8, 2013 - Tiles set/retrieved June 4, 2013 - Tiles set/retrieved July 2, 2013 - Tiles set/retrieved July 31, 2013, Tiles/set retrieved September 3, 2013 - Tiles set/retrieved October 3, 2013 - Tiles set/retrieved October 29, 2013 - Tiles set/retrieved August 7, 2012 - tiles set/retrieved; commensal bags retrieved September 12, 2012 - tiles set/retrieved October 5 & 6 2012 - tiles set/retrieved; commensal bags deployed; sediment samples collected. November 5, 2012 - tiles retrieved; commensal bags retrieved